Oriental Yuhong · Sports flooring

EPDM rubber flooring in Tanzania.

A specialty primer, an EPDM granules base layer and an anti-slip, wear-resistant surface layer.

Supplied by Sahihi Construction Chemicals, ordered per job, ready in 3 to 5 days.

A colourful EPDM play surface in blue, yellow and red

Where it goes

For fitness trails, walkways and general ground protection.

  • Good permeability
  • Easy to construct and maintain
  • Versatile application

The build-up

Pull the epdm walking track apart.

A labelled diagram, not to scale.

The layers, top to bottom

EPDM granules of different colours, 5 mm, spread to make the patterns. In the 13 mm system: PSV-306 non-yellowing adhesive with PSV-407 1-3 mm granules.

Turned it, pulled it apart? Ask us for it.

Materials

What your area takes.

Common court sizes. Measure your own site.

Materials for 13 mm EPDM surface, 8 mm elastic layer and 5 mm topcoat, 608 m²
ProductLayerQuantityPacks
PSV-211 Single-Component AdhesiveBase primer, Elastic layer768 kg-
PSV-406 2-4 mm rubber granules, redElastic layer4,864 kg-
PSV-306 Non-Yellowing AdhesiveTopcoat506 kg-
PSV-407 1-3 mm rubber granules, colour-blendedTopcoat3,040 kg-
ThinnerBought locallyAuxiliary38.3 kg-
PSV-701 Line Marking Paint, water-basedLine marking6.1 kg-

From Oriental Yuhong's consumption per m², without waste. Porous asphalt takes more primer, so check on site. A guide, not a quotation.

On site

How the surface goes down.

  1. A worker checking and preparing the substrate

    01

    Substrate verification

    Asphalt or concrete, more than 28 days old, flatness of 5 mm or better per 3 m, pull-off strength above 2 MPa.

  2. Two workers spreading a green elastic layer

    02

    Primer and elastic granules

    The primer is trowel spread, with elastic granules spread into it to enhance the adhesion.

  3. A worker smoothing the layer with an electric trowel

    03

    Elastic base layer

    Trowelled and ironed with an electric trowel, 8 to 10 mm thick.

  4. A coloured play surface marked out in a school yard

    04

    Positioning and layout

    All the patterns are drawn out as required.

  5. Workers laying coloured patterns of EPDM granules

    05

    Surface layer

    EPDM granules of different colours make the patterns, 5 mm thick.

  6. Blue granules being finished with a power trowel

    06

    Spread, trowel, finish

    The surface granules are spread, trowelled and finished with soapy water.

Downloads

Oriental Yuhong's documents.

For this system's own pages, ask us.

FAQs

EPDM walking track, in short.

An 8 mm elastic layer of red granules under a 5 mm coloured topcoat.

  • Primer and elastic layer: PSV-211 single-component adhesive
  • Elastic layer granules: PSV-406, 2 to 4 mm
  • Topcoat: PSV-306 non-yellowing adhesive with PSV-407 1 to 3 mm granules

Fitness trails, walkways, play areas and general ground protection.

    Yes. Supplied by Sahihi Construction Chemicals, ordered per job, ready in 3 to 5 days.

    • Send the area, the sport and the base for a written quotation
    • Prices are not published on this site

    EPDM walking track in Tanzania

    Send the area and the sport.

    Tell us the size, the sport and what the base is. You get a written quotation from our Dar es Salaam office.