Oriental Yuhong · Sports flooring
Artificial turf in Tanzania.
Artificial turf, quartz sand, rubber particles and a shock-absorbing pad, on a concrete base layer.
Supplied by Sahihi Construction Chemicals, ordered per job, ready in 3 to 5 days.

Where it goes
For football fields, basketball courts, tennis courts, hockey fields and golf courses.
- Environmental friendliness
- Security: no slipping or scratches
- Durable and weather resistant
- Lays on asphalt, cement and hard sand
Also called synthetic turf.
The build-up
Pull the artificial turf apart.
A labelled diagram, not to scale.
The layers, top to bottom
Laid with special glue. Fibres of polypropylene, or of polyethylene and polypropylene, with UV absorbers.
Turned it, pulled it apart? Ask us for it.
Oriental Yuhong's selection table
Where it fits best.
- Fitness trailNot suited
- School trackNot suited
- Outdoor courtNot suited
- Football fieldBest
- KindergartenPossible
Oriental Yuhong's film
Watch one go down, step by step.
Materials
What your area takes.
Common court sizes. Measure your own site.
| Product | Layer | Quantity | Packs |
|---|---|---|---|
| PSV-104 Shock Pad | Base layer | 608 m² | - |
| PSV-105 Turf Adhesive | Base layer | 122 kg | - |
| PSV-601 Artificial Turf | Artificial turf | 626 m² | - |
| PSV-407 Rubber infill for artificial turf (20%) | Infill | 3,040 kg | - |
| Quartz sandBought locally | Infill | 15,808 kg | - |
| Seaming tape | Auxiliary | 30.4 m² | - |
Turf at 10,500 stitches per m², in yarn of 8,800, 9,500 or 12,000 Dtex; TPE infill with 20% binder.
From Oriental Yuhong's consumption per m², without waste. Porous asphalt takes more primer, so check on site. A guide, not a quotation.
How it is built
The stages, and the site.
- 01Positioning and laying out
- 02Laying
- 03Gluing
- 04Adhesive
- 05Compression
- 06Solidifying
- 07Sand filling
- 08Filling elastic particles
Downloads
Oriental Yuhong's documents.
FAQs
Artificial turf, in short.
A shock pad, the turf glued at the seams, quartz sand and rubber infill.
- PSV-104 shock pad and PSV-105 turf adhesive
- PSV-601 turf, 10,500 stitches per m²
- PSV-407 rubber infill and about 26 kg of quartz sand per m²
8,800, 9,500 or 12,000 Dtex, in Oriental Yuhong's list.
Asphalt, cement and hard sand sites, according to Oriental Yuhong.
Yes. Supplied by Sahihi Construction Chemicals, ordered per job, ready in 3 to 5 days.
- Send the area, the sport and the base for a written quotation
- Prices are not published on this site
The other systems
Seven systems. Six more to see.
- All plastic trackPolyurethane right through, for school and stadium tracks.Open
- Breathable trackEPDM layers that let heavy rain drain away.Open
- Hybrid trackPolyurethane with EPDM particles, for cost performance.Open
- Silicon PU courtBasketball, tennis and badminton, 5 or 8 mm.Open
- Acrylic courtHard or 5 mm elastic, on asphalt or concrete.Open
- EPDM walking trackColoured rubber granules for trails and play areas.Open
- All sports flooringThe chooser, the films, the calculatorOpen
Artificial turf in Tanzania
Send the area and the sport.
Tell us the size, the sport and what the base is. You get a written quotation from our Dar es Salaam office.






