Oriental Yuhong · Sports flooring
Acrylic sports courts in Tanzania.
A specialized base adhesive, an acrylic mid-layer and a wear-resistant acrylic surface layer. The elastic version builds 5 mm of coarse and fine acrylic elastic coats.
Supplied by Sahihi Construction Chemicals, ordered per job, ready in 3 to 5 days.

Where it goes
For tennis courts, low-cost outdoor basketball courts, lightweight rooftop courts and gym equipment areas. On asphalt or concrete only.
- Durability
- Rebound
- Load-bearing
Also called acrylic sports court, hard or elastic.
The build-up
Pull the acrylic court apart.
A labelled diagram, not to scale.
The layers, top to bottom
PSV-701/702 sports field marking paint.
Turned it, pulled it apart? Ask us for it.
Materials
What your area takes.
Common court sizes. Measure your own site.
| Product | Layer | Quantity | Packs |
|---|---|---|---|
| PSV Acrylic Primer | Base primer | 213 kg | 5 × 50 kg |
| PSV-108 Adhesive | Base primer | 91.2 kg | 2 × 50 kg |
| Cement, 42.5 gradeBought locally | Base primer | 365 kg | - |
| Quartz sandBought locally | Base primer | 243 kg | - |
| PSV Acrylic Topcoat, red, green or blue | Topcoat | 243 kg | 10 × 25 kg |
| Quartz sand (200 mesh) | Topcoat | 182 kg | 4 × 50 kg |
| PSV Acrylic Line Marking Paint | Line marking | 6.1 kg | 2 × 4 kg |
From Oriental Yuhong's consumption per m², without waste. Porous asphalt takes more primer, so check on site. A guide, not a quotation.
How it is built
The stages, and the site.
- 01Foundation construction
- 02Primer coating
- 03Intermediate coating
- 04Interface layer
- 05Surface layer
- 06Marking
- Concrete of C25 strength, solid, with no laitance or dusting, cured at least 28 days for silicon PU and 20 days for acrylic.
- A fall of 0.5 to 0.7% so the court drains. Under a 3 m straightedge, water less than 3 mm deep, at 90% of the test points.
- Asphalt cured at least 7 days, SMA at least 10. Porous asphalt takes more primer: agree the quantity on site.
- New concrete: expansion joints cut about every 5 × 6 m, 6 to 8 mm wide and at least 20 mm deep, then filled.
- Build silicon PU between 5 and 35°C, humidity below 85%, with no rain for 4 hours. Acrylic between 10 and 35°C, humidity below 80%.
- Concrete moisture below 8% before silicon PU goes on.
Drying
| Layer | Surface dry | Next coat |
|---|---|---|
| Primer | 1 hour | 12 hours |
| Elastic layer | 1 hour | 3 hours |
| Finish layer | 1 hour | 3 hours |
| Line marking | 1 hour | 3 hours |
At 23°C and 50% relative humidity.
Downloads
Oriental Yuhong's documents.
FAQs
Acrylic court, in short.
Hard acrylic is primer and topcoat. Elastic acrylic adds 5 mm of coarse and fine elastic coats under the topcoat.
Asphalt or concrete only. Oriental Yuhong does not recommend other bases.
- Acrylic does not stop cracks in the base from coming through
- Mix with clean water only, and not too much
Tennis courts, low-cost outdoor basketball courts, lightweight rooftop courts and gym equipment areas.
Yes. Supplied by Sahihi Construction Chemicals, ordered per job, ready in 3 to 5 days.
- Send the area, the sport and the base for a written quotation
- Prices are not published on this site
The other systems
Seven systems. Six more to see.
- All plastic trackPolyurethane right through, for school and stadium tracks.Open
- Breathable trackEPDM layers that let heavy rain drain away.Open
- Hybrid trackPolyurethane with EPDM particles, for cost performance.Open
- Silicon PU courtBasketball, tennis and badminton, 5 or 8 mm.Open
- Artificial turfFootball pitches on a shock pad, with sand and rubber infill.Open
- EPDM walking trackColoured rubber granules for trails and play areas.Open
- All sports flooringThe chooser, the films, the calculatorOpen
Acrylic court in Tanzania
Send the area and the sport.
Tell us the size, the sport and what the base is. You get a written quotation from our Dar es Salaam office.






