Back to Primers, Levelling & Wood Flooring
Mapei Triblock P, primer: the pack
Mapei's own picture. The pack we stock: 5 kg.

Mapei · PrimerNo. 11 / 47

Triblock P

Three-component epoxy-cementitious primer for damp substrates.

Three-component, epoxy-cementitious primer for damp substrates

  • Triblock P is used as a waterproofing treatment for damp substrates
  • Old ceramic or terrazzo floor dressings on substrates with excessive residual humidity
  • Highly-compact cementitious substrates with a residual humidity content higher than the level recommended for laying wooden, resilient and resin floors
  • Treating damp concrete surfaces before applying protective and anti-corrosion epoxy products, or polyurethane dressing systems which are impermeable to water vapour
  • Dressing concrete channels, drains and pipe-work
  • By adding 0.25 Quartz o 0.5 Quartz sand at a ratio of 1 : 0.5 for smoothing over uneven surfaces
Consumption
250-500 g/m² per coat, two coats
Pack we stock
5 kg

Related documentation

  • Technical data sheet

    Edition 2043-11-2022 gb · 4 pages · 1.1 MB · PDF

    DownloadOpen
  • Safety data sheet

    Sent by WhatsApp or email

    Request

Mapei's own document, unaltered, saved on 2026-11-05. Mapei revises its data sheets: ask us for the current edition before you specify.

Coverage calculator

The arithmetic uses Mapei's published consumption for Triblock P and the pack sizes we stock. Set your own wastage allowance.

m²
coats
Application
%

You need

3

x 5 kg kit (A + B + C)

Data sheet quantity
10-12 kg
With 10% wastage
11-13.2 kg
Send this to WhatsApp for a quote

The figures behind it.

  • 250-300 g/m² per coat on non-absorbent surfaces.
  • 400-500 g/m² per coat on absorbent surfaces.
  • 1.5 kg/m² per mm of thickness for smoothing applications.

The data sheet applies Triblock P in two criss-cross coats.

Consumption on site depends on the substrate, the tool and the applicator, which is why wastage is yours to set. The result is a quantity to plan and quote with, not a guarantee of coverage. Confirm the system against the current Mapei technical data sheet before ordering.

Application

In Mapei's own words, from the technical data sheet.

  1. 01Triblock P is used as a waterproofing treatment for damp substrates
  2. 02Old ceramic or terrazzo floor dressings on substrates with excessive residual humidity
  3. 03Highly-compact cementitious substrates with a residual humidity content higher than the level recommended for laying wooden, resilient and resin floors
  4. 04Treating damp concrete surfaces before applying protective and anti-corrosion epoxy products, or polyurethane dressing systems which are impermeable to water vapour
  5. 05Dressing concrete channels, drains and pipe-work
  6. 06By adding 0.25 Quartz o 0.5 Quartz sand at a ratio of 1 : 0.5 for smoothing over uneven surfaces

Where it is not the right product.

  • Do not apply Triblock P directly on: · surfaces with free-standing water; · dusty, flaky, irregular surfaces with bleeding; · anhydrite or gypsum-based substrates; · old, cementitious or gypsum-based smoothing layers
  • Do not apply Triblock P on cracks which are subject to movement, as the product is rigid and may also crack
  • Do not use the product if the surrounding temperature or the temperature of the substrate is lower than +5°C

Specification

Mixing ratio
comp. A : comp. B : comp. C = 12 : 38 : 50
Density of mix
1,800 kg/m³
Recommended application temperature range
from +5°C to +35°C
Pot life
from 30 to 40 minutes
Dry to the touch
after approx. 4-6 hours
Waiting time between first and second coat
4-6 hours
Set to light foot traffic
24 hours
Waiting time before further applications
from a minimum of 24 hours up to a maximum of 7 days
Final setting time
7 days
Bonding to ceramic
> 3.5 MPa (failure of the ceramic)
Bonding to concrete
> 3 MPa (failure of concrete)
In service temperature range
from -35°C to +100°C

Typical values as Mapei prints them in data sheet edition 2043-11-2022 gb. They are not a specification for your project: the current Mapei data sheet is.

On site

Packs, mixing and storage.

We stock
5 kg
Mapei packaging
5 kg kits (A + B + C): component A: 0.6 kg; component B: 1.9 kg; component C: 2.5 kg.
Mixing
The mixing ratio between the three components is 12 : 38 : 50 in weight.
Storage
12 months in its original, closed containers. Protect against frost and store at a temperature of at least 5°C.

Triblock P in Tanzania

Tell us the area. We will quote the job.

Sahihi is an authorized Mapei distributor in Dar es Salaam. Send the quantity of Triblock P you need, or describe the job and we will work it out with you.