Two-component solvent-free epoxy adhesive for construction joints and for monolithic sealing of cracks in screeds.
Two component solvent-free epoxy adhesive for construction joints and for monolithic sealing of cracks in screeds
- Monolithic construction joints between fresh and hardened concrete
- Bonding precast concrete elements
- Bonding steel to concrete
- Filling cracks in concrete
- Construction joints for the structural reinforcement of beams and pillars
- Construction joints on decayed industrial flooring
- Rigid, waterproof construction joints (e.g. concrete bed to tank walls)
- Sealing cracks in cement screeds
- Consumption
- 0.5-0.7 kg/m² on rough substrates, 1-2 kg/m² on very uneven ones
- Pack we stock
- 2 kg set
Coverage calculator
How much you need.
The arithmetic uses Mapei's published consumption for Eporip and the pack sizes we stock. Set your own wastage allowance.
You need
6-8
x 2 kg kit (A 1.5 kg + B 0.5 kg)
- Data sheet quantity
- 10-14 kg
- With 10% wastage
- 11-15.4 kg
The figures behind it.
- construction joints with a rough substrate: 0.5-0.7 kg/m²
- construction joints with a very uneven substrate: 1.0-2.0 kg/m²
- sealing cracks: 1.35 kg/l per litre of cavity
- bonding precast elements in concrete, or steel-and-concrete: 1.35 kg/m² per mm thickness.
Consumption on site depends on the substrate, the tool and the applicator, which is why wastage is yours to set. The result is a quantity to plan and quote with, not a guarantee of coverage. Confirm the system against the current Mapei technical data sheet before ordering.
Application
Where it is used.
In Mapei's own words, from the technical data sheet.
- 01Monolithic construction joints between fresh and hardened concrete
- 02Bonding precast concrete elements
- 03Bonding steel to concrete
- 04Filling cracks in concrete
- 05Construction joints for the structural reinforcement of beams and pillars
- 06Construction joints on decayed industrial flooring
- 07Rigid, waterproof construction joints (e.g. concrete bed to tank walls)
- 08Sealing cracks in cement screeds
Where it is not the right product.
- Do not apply Eporip at temperatures lower than +5°C
- Do not use Eporip on wet surfaces (even though they can be slightly damp)
- Do not cast fresh concrete onto hardened Eporip
- Do not use Eporip on dusty, crumbling or loose surfaces
Specification
Technical data.
- EN 1504-4 · Structural bonding
- EN 1504-9 · meets the requirements defined by EN 1504-9
- EN 13501-1 · C-s1, d0
- Mixing ratio
- component A : component B = 3 : 1
- Consistency of mix
- fluid paste
- Colour of mix
- grey
- Density of mix
- 1.35 kg/l
- Workability time (EN ISO 9514)
- at +10°C: 90 minutes - at +23°C: 60 minutes - at +30°C: 40 minutes
- Open time
- at +10°C: 5-6 hours - at +23°C: 3-4 hours - at +30°C: 1 hour 30 minutes-2 hours 30 minutes
- Application temperature range
- from +5°C to +30°C
- Complete hardening time
- 7 days
- Concrete-steel bond strength
- > 3 N/mm² (failure of concrete)
- Shear strength
- 9 N/mm²
- Compressive strength
- 70 N/mm²
- Compressive modulus of elasticity
- 3,000 N/mm²
Typical values as Mapei prints them in data sheet edition 366-2-2025 en (IT). They are not a specification for your project: the current Mapei data sheet is.
On site
Packs, mixing and storage.
- We stock
- 2 kg set
- Mapei packaging
- 10 kg kits (7.5 kg of component A, 2.5 kg of component B). 2 kg kits (1.5 kg of component A, 0.5 kg of component B).
- Mixing
- component A : component B = 3 : 1
- Storage
- 24 months in original packaging. Eporip should be stored indoors in a cool, dry place where the temperature is between +5°C and +30°C.
Related products
Concrete Repair, Grouts & Anchoring.
Eporip in Tanzania
Tell us the area. We will quote the job.
Sahihi is an authorized Mapei distributor in Dar es Salaam. Send the quantity of Eporip you need, or describe the job and we will work it out with you.